Case Study
Food Processing Packaging Extension
Problem
- A Rocky Mountain frozen food processor required an upgrade to inefficient refrigeration systems as part of their overall facilities management program
- The client needed to perform an energy audit and deliver an estimate of CAPEX and OPEX savings to upgrade this and other systems
Solution
- McClure Engineering assessed the existing system efficiency, analyzed low OPEX options to replace dilapidated equipment, and sought energy company incentives to reduce CAPEX required for the client
- Services Performed: design, construction observation, and project coordination
Result
- Energy savings CAPEX costs of greater than $1Million
- OPEX reduced by 6M kWhr/year saving over $300,000 per year